A maintenance contract that pays for engineer days will reliably produce engineer days. Whether the machines run is a separate question, and one the contract has no opinion about. That gap between what an organisation pays for and what it actually wants is the reason outcome-based contracting exists, and also the reason it fails when it is applied to the wrong thing.
An outcome-based contract defines delivery as a measurable result: a level of availability, a volume processed, a service level sustained, a condition achieved. The supplier decides how to get there and carries the consequences of the method. It is a powerful arrangement in the right circumstances and an expensive mistake in the wrong ones, and the circumstances are the part worth spending time on.
Procurement is covered in Appendix X4 of the PMBOK® Guide Eighth Edition, which sets contracting choices alongside the rest of delivery, where they belong.
What is actually being bought
Inputs are the simplest form. You buy days, hours or people, you direct the work, and you carry the risk that the work takes longer than expected. Clear, flexible, and entirely dependent on your own ability to manage what the people are doing.
Deliverables are the middle ground and the most common commercial arrangement. You buy a defined thing: a system configured to a specification, a building handed over, a report produced. Acceptance is against the specification, and whether the thing then works well in service is a question the contract tends not to reach.
Outcomes go one step further and buy the condition you actually want. Equipment available for a proportion of planned production time. Streets lit. Claims settled within a period. The supplier is free to reach that condition however it sees fit, including by investing in better equipment or by preventing problems that a day-rate contract would have been paid to fix.
The incentive shift is the point of the whole arrangement. Under input contracting, a failure generates revenue for the supplier. Under an outcome contract, the same failure costs them, so prevention becomes commercially attractive to the party best placed to do it.
The conditions an outcome contract needs
The outcome has to be measurable in a way both parties would accept in advance. Not a description of a good service, but a number with a method behind it: measured how, from which source, at what frequency, excluding what.
It has to be attributable. Where the result depends on factors outside the supplier’s control, and no adjustment is agreed for them, the contract will be argued rather than managed. A supplier held to output figures when the client supplies the raw material late is in a position no amount of goodwill survives.
It has to be influenceable by the supplier. They need the authority to change how the work is done, including the parts the client used to specify. An outcome contract wrapped in prescriptive method requirements gives the supplier the risk without the levers, which is the most common way these arrangements are spoiled.
The measurement itself needs an owner both sides trust. Whether the data comes from the client’s systems, the supplier’s, or a third source, that decision belongs in the contract and not in the first month of operation. Measurement disputes are harder to settle than performance disputes, because neither party can prove anything.
Street lights and who counts them
A county council changed how it bought street lighting maintenance. The old arrangement paid a schedule of rates per fault attended, which worked, in the sense that faults were attended. It gave the contractor no reason to care why the same columns kept failing.
The replacement bought availability: a percentage of lamps lit, measured monthly across the network, with a payment mechanism that moved with performance. Within the first year the contractor had replaced a run of ageing control gear that had generated a steady stream of callouts, work the council had never funded because it appeared each year as a maintenance cost with no obvious benefit. Faults fell and the cost of the contract fell with them.
The difficulty was the counting. Availability was measured from the contractor’s own monitoring, installed by the contractor, and the council had no independent view of it. Nothing improper occurred, and the council still spent a difficult quarter unable to answer a scrutiny committee asking how it knew the figures were right. The fix was a sampled physical survey by a third party, agreed afterwards at a cost that would have been trivial to include at the start. Working out which results are worth contracting for, and who should hold the measurement, is procurement thinking Omega’s PMP® Exam Preparation examines closely.
Where these arrangements go wrong
Outcomes driven by demand the supplier does not control. Paying a processing partner against a volume target when volume depends on the client’s own marketing puts the supplier in the position of being penalised for somebody else’s decisions. Either the measure changes to something they influence, such as throughput per received item, or the arrangement becomes a standing grievance.
Measurement without a maintained method. Availability sounds simple until a planned shutdown, a client-caused stoppage and a partial failure each need classifying, and the classification was never written down. Every one of these is easy to agree in advance and contentious in arrears, which is a good description of contract management generally.
For a PMP® candidate, a procurement scenario is worth reading for what the payment mechanism rewards. Where a description mentions a supplier meeting every contractual obligation while the client remains dissatisfied, the contract is usually buying activity while the client wanted a result, and the response worth considering is a change to what is being bought.
Before proposing an outcome arrangement, there is a short test. Write the measure down in one sentence, name the source of the data, and ask the supplier’s account manager what they would do differently under it. Where the answer is nothing, the outcome is not one they can influence, and the contract you are drafting will not do what you hoped.
Interested in going further?
Choosing what to buy, and structuring the payment so it rewards the result you want, is a judgement that shapes a supplier relationship for its whole life. Omega’s PMP® Exam Preparation works through procurement strategy, contract types and supplier management as a connected set.
Free study planner
Find out how ready you are for the PMP® exam
Our free PMP® Exam Readiness & Study Planner checks your likely eligibility route, shows the areas that need most attention and builds a week-by-week study plan around the time you have. It takes about 3 minutes.
Want to prepare with a trainer? See our five-day live online PMP® course.
Appendix X4 of the PMBOK® Guide Eighth Edition is the reference for how contracting choices sit within the wider delivery picture.
Ad · Amazon affiliate link.
References
A245: Make or Buy? How to Decide Before Procurement Begins
A246: Procurement Strategy: Decide How You Will Buy Before You Go to Market
A247: RFP vs RFQ vs IFB vs ITT: Which Procurement Document Should You Use?
A248: Choosing a Supplier: Cheapest Is Not the Same as Best
A249: Fixed-Price vs Cost-Reimbursable vs Time-and-Materials Contracts
PMP and PMBOK are registered marks of the Project Management Institute, Inc.