Articles
Articles on project delivery, governance, risk, predictive, Agile and hybrid practice, alongside a growing PMP® knowledge library for professionals preparing for the current exam.
The Focus Areas are drawn as a line, with initiating at the front of it. On a real project the question of who authorised this work, and whether it still matters, comes back at every boundary.
Continue reading
Phases feel like structure, but a boundary only does work if a real decision sits on it. How to tell a working gate from a decorative one, and where boundaries belong on predictive, adaptive and hybrid delivery.
Continue reading
Delivery cadence is the rhythm at which finished work reaches the people who will use it, and it is often confused with sprint length. Getting it right shapes how quickly a project learns, when value begins and how much change the organisation has to absorb at once.
Continue reading
Two projects can build almost the same thing and still need different delivery approaches. The difference often lies in the project's own conditions: who is available, which dates are fixed, and how the money arrives.
Continue reading
Before you decide between predictive, Agile or hybrid, look at what the project has to hand over. How a deliverable can be released, changed and tested often tells you more than any method preference.
Continue reading
The trade-offs that cost most are usually the ones whose consequences land outside the project. This is how to weigh wider impact against the value a project exists to create, before the decision is made.
Continue reading